New construction is where an electrical system gets built right the first time — or built with shortcuts that show up later. We wire new homes and additions across Snohomish & King County from rough-in through final inspection.
- Full rough-in wiring to code
- Permit & inspection handled
- EV & generator ready circuits
- Coordinated with your GC
New Construction Wiring
Why It Matters
Wired Right Before the Walls Close Up
Everett and the surrounding Snohomish County communities have grown fast — new construction, infill builds, and additions are a steady part of what we do, often on tighter timelines than a remodel. We work from your plans to rough-in circuits, panels, and low-voltage runs before drywall goes up, then return for trim-out once finishes are in place.
We also plan for what a new home actually needs today — dedicated EV charger circuits, panel capacity for a future generator, and smart-home wiring runs — so you’re not opening finished walls again in five years to add capacity that should have been there from the start.
“The cheapest time to add capacity is during rough-in — not after the drywall is up.”
What’s Included
Every Job, Built to Code
From the first rough-in to the final walkthrough, every new construction job includes the same standard of work.
Full Rough-In Wiring
Circuits, boxes, and low-voltage runs installed to code before drywall goes up.
Panel Sizing & Install
Panel sized for current load plus reasonable future growth — not just what’s needed today.
Outlet & Switch Layout
Placement planned around your floor plan, not just the minimum code requirement.
EV & Generator Prep
Dedicated circuits and panel capacity planned in from the start, not retrofitted later.
Permit Coordination
We pull the permit, schedule the inspection, and handle it directly — no gaps in your close-out.
Trim-Out & Walkthrough
Fixtures, devices, and covers installed once finishes are in, with a final walkthrough together.
How It Works
From Plans to Final Walkthrough
01
Plan Review
We review your architectural plans and scope the electrical rough-in before anything is scheduled.
02
Rough-In Wiring
Circuits, panel, and low-voltage runs installed before drywall — coordinated with your GC’s timeline.
03
Inspection & Permit
We schedule and pass the rough-in inspection directly, with no delay to your build schedule.
04
Trim-Out & Walkthrough
Fixtures and devices installed once finishes are up, ending with a final walkthrough together.
FAQ
Common Questions About New Construction Wiring
Do you work directly with our general contractor?
Yes — we regularly coordinate schedules and scope directly with GCs, and can join a pre-construction walkthrough if needed.
Can you wire for a future EV charger or generator?
Yes, and we recommend it. Adding dedicated circuits and panel capacity during rough-in costs a fraction of retrofitting it after the home is finished.
How long does rough-in wiring take?
It depends on the size of the home and complexity of the plan, but most residential rough-ins are scheduled within your framing-to-drywall window.
Do you handle the permits and inspections?
Yes — every job that requires a permit gets one, and we schedule and manage the inspection directly so it doesn’t hold up your build.
We're doing an addition, not a full new build — does this still apply?
Yes — additions follow the same rough-in-to-trim-out process, and we tie the new circuits into your existing panel or upgrade it if there isn’t enough capacity.