A standard wall outlet can take over 24 hours to fully charge an EV. A properly installed Level 2 charger cuts that down to a few hours overnight — but it also draws a serious electrical load, which means it has to be sized to your panel and wired correctly from the start.
- Level 2 charger installation, any brand
- Panel load calculation included
- Indoor & outdoor charger placement
- Permit & inspection handled
EV Charger Installation
Why It Matters
Charging Speed Depends on the Wiring, Not Just the Charger
Every Level 2 charger needs a dedicated circuit sized to its amperage — usually 40 to 60 amps — run directly from your panel. Installing one on an undersized or shared circuit can trip breakers repeatedly or, worse, create a fire hazard over time.
We calculate your home’s total electrical load before adding a charger, and if your panel doesn’t have the capacity, we’ll tell you upfront whether a panel upgrade should happen first, rather than force a charger onto a system that can’t support it.
“A fast charger on the wrong circuit isn’t fast — it’s a problem waiting to trip.”
What’s Included
Charging Built Around Your Panel and Your Car
Every EV charger install starts with your home’s actual electrical capacity, not just where you want it mounted.
Panel Load Calculation
We confirm your panel has the capacity for a dedicated EV charging circuit before any wiring starts.
Dedicated Circuit Installation
A properly sized circuit run directly from your panel to the charger location.
Charger Mounting, Any Brand
Installation for Tesla, ChargePoint, JuiceBox, and other major Level 2 charger brands.
Garage & Outdoor Placement
Charger installation in garages, carports, or exterior walls, weatherproofed where needed.
Panel Upgrade Coordination
If your panel can’t support the added load, we’ll size and coordinate an upgrade alongside the charger install.
Permit & Inspection Handling
We pull the permit, schedule the inspection, and manage it directly through sign-off.
HOW IT WORKS
From Load Check to Overnight Charging
01
Home Assessment
A licensed electrician checks your panel’s available capacity and the charger’s planned location.
02
Circuit & Placement Plan
We size the dedicated circuit and confirm mounting location, indoor or outdoor.
03
Installation & Inspection
The circuit and charger are installed to code, with inspection scheduled and managed.
04
Test & Walkthrough
We test a full charge cycle and walk you through the charger before we call it done.
FAQ
Common Questions About EV Charger Installation
Can my existing panel handle an EV charger?
It depends on your panel’s size and current load. We calculate this during the home assessment and let you know upfront if an upgrade is needed.
Do I need a permit for an EV charger installation?
Yes. EV charger circuits require an electrical permit and inspection in Snohomish and King County. We handle both directly.
Can you install a charger for any EV brand?
Yes, we install Level 2 chargers for Tesla, ChargePoint, JuiceBox, and most other major brands.
How long does EV charger installation take?
Most installations take a few hours if your panel has capacity. If a panel upgrade is needed first, we’ll give you a combined timeline.
Can the charger be installed outside?
Yes, we install weatherproof-rated chargers on exterior walls and in carports as well as garages.
Let’s Get Connected
Have an Electrical Project in Mind?
Request a free consultation and a licensed electrician will follow up the same business day — or call now for anything urgent.