New Construction Wiring

New construction is where an electrical system gets built right the first time — or built with shortcuts that show up later. We wire new homes and additions across Snohomish & King County from rough-in through final inspection.

New Construction Wiring

Why It Matters

Wired Right Before the Walls Close Up

Everett and the surrounding Snohomish County communities have grown fast — new construction, infill builds, and additions are a steady part of what we do, often on tighter timelines than a remodel. We work from your plans to rough-in circuits, panels, and low-voltage runs before drywall goes up, then return for trim-out once finishes are in place.

We also plan for what a new home actually needs today — dedicated EV charger circuits, panel capacity for a future generator, and smart-home wiring runs — so you’re not opening finished walls again in five years to add capacity that should have been there from the start.

“The cheapest time to add capacity is during rough-in — not after the drywall is up.”

What’s Included

Every Job, Built to Code

From the first rough-in to the final walkthrough, every new construction job includes the same standard of work.

Full Rough-In Wiring

Circuits, boxes, and low-voltage runs installed to code before drywall goes up.

Panel Sizing & Install

Panel sized for current load plus reasonable future growth — not just what’s needed today.

Outlet & Switch Layout

Placement planned around your floor plan, not just the minimum code requirement.

EV & Generator Prep

Dedicated circuits and panel capacity planned in from the start, not retrofitted later.

Permit Coordination

We pull the permit, schedule the inspection, and handle it directly — no gaps in your close-out.

Trim-Out & Walkthrough

Fixtures, devices, and covers installed once finishes are in, with a final walkthrough together.

How It Works

From Plans to Final Walkthrough

01

Plan Review

We review your architectural plans and scope the electrical rough-in before anything is scheduled.

02

Rough-In Wiring

Circuits, panel, and low-voltage runs installed before drywall — coordinated with your GC’s timeline.

03

Inspection & Permit

We schedule and pass the rough-in inspection directly, with no delay to your build schedule.

04

Trim-Out & Walkthrough

Fixtures and devices installed once finishes are up, ending with a final walkthrough together.

FAQ

Common Questions About New Construction Wiring

Do you work directly with our general contractor?

Yes — we regularly coordinate schedules and scope directly with GCs, and can join a pre-construction walkthrough if needed.

Yes, and we recommend it. Adding dedicated circuits and panel capacity during rough-in costs a fraction of retrofitting it after the home is finished.

It depends on the size of the home and complexity of the plan, but most residential rough-ins are scheduled within your framing-to-drywall window.

Yes — every job that requires a permit gets one, and we schedule and manage the inspection directly so it doesn’t hold up your build.

Yes — additions follow the same rough-in-to-trim-out process, and we tie the new circuits into your existing panel or upgrade it if there isn’t enough capacity.